Ceva Logistics has opened a third building at its logistics hub at San Pietro Mosezzo, near Novara, Italy, taking the total available space to 85,000 sq m.
The San Pietro Mosezzo warehouse has been fitted in total with more than 9,600 photovoltaic panels, covering an area of 16,000 sq m. The plant can produce 2,500 MWh of energy per year, which is the equivalent of 700 households. It is also equipped with 98 loading bays handling approximately 25 incoming and 40 outgoing trucks each day.
By the end of 2010, CEVA will complete seven logistics hubs in Italy with eco-sustainable structures and will refurbish two of the existing sites to the same specification.