[asset_ref id=”1619″]
West Yorkshire transport company ADD Express selected Quickline to fit out its new 30,000 sq ft warehouse on the Lowfields Business Park in Elland.
ADD is racking out 60 per cent of the warehouse area for customer storage and keeping the remaining area as cross dock space. It is taking articulated fork lifts to work in aisles of 2m wide.
The adjustable pallet racking system provides over 2,700 pallet locations, and is installed over eight double runs and one single run. The frames are installed at over 8.5m at the highest point, giving four beam levels.
Each upright is protected by a bespoke sleeve guard and the ends of the racks are protected by a twin box barrier.