Browsing: Article

Plans have been approved to demolish the former Chungwa building at Eurocentral and create a new £300m business park which will include four new warehouse units totalling 244,000 sq ft.

Transdek UK has produced a mobile lifting platform that can be used to load and unload double-stacked containers, allowing customers such as multiple retailers to increase their external storage capacity at lower cost.

The planning application is split into two main parts: The Site Preparation Planning Application and The Olympic and Legacy Transformation Planning Application.

Achieving the higher output, would normally have required the lengthening of the existing assembly line, to accommodate the additional operators needed.

Many organisations in the transport & logistics sector admit they are failing to prepare for disruption, despite recording a dramatic increase in the level of upheaval caused by extreme weather conditions and high levels of people and skills loss, accordi

Schenker has taken 15,160 sq ft at London & Cambridge Properties’ warehouse Units 203 A and B Burcott Road, Avonmouth, on a 15-year lease at £4.

With speculative development taking off at Heathrow, Liza Helps asks what will this mean for occupiers?