ORGANISING a second Logistics Link exhibition, albeit one some 200 miles away from Sandown Park, always ran the risk of duplicating the visitor profile. However, as planned, this was avoided because whereas 62% of attendees at Logistics Link at Sandown Pa
Browsing: Archive
Thamesport (London) is using seven new Terberg terminal tractors, from UK dealer Transtec Equipment, in addition to the four that arrived at the port in May. A further eight are due for delivery to the Medway facility in March 2005, completing the
The past few years have been far from easy: slashed budgets have resulted in skeleton IT departments and overdue system upgrades. The ‘do more with less’ philosophy has been tough resulting in a further plunge in IT’s corporate credibility.
If a Royal Navy submarine requires a spare part or munitions, the equipment must be supplied without fail and, most importantly, on time. And it is the job of FSL Logistics to ensure that whatever the armed forces need, they get it when they want it, and
Spalding-based Flower Plus is a £30M turnover, leading manufacturer of fresh flowers and associated products. Formed in 1986,
Fresenius Medical Care (FMC) has been using Spatial Logistics this summer to provide critical deliveries to kidney dialysis patients across the world. FMC is a global leader in dialysis products and treatments for patients with chronic kidne
A new logistics training scheme has just been launched in West Lothian, an area of dynamic economic growth strategically located between Glasgow and Edinburgh.
Hi-Gear, distributor of camping, two-wheel, ski and general outdoors equipment and accessories, has amalgamated several distribution centres into one newly acquired central distribution centre near Sleaford in Lincolnshire.
Comet has awarded a major contract to Amtrak Express Parcels as part of moves to improve home delivery services. Amtrak is delivering Comet’s small electrical and electronic items, working alongside existing carrier Parcelforce
The construction of a 23,700sq m distribution warehouse has been completed by Gazeley in just 14 weeks. The facility is the first in mainland Europe to be built using Gazeley’s company’s fast track development system G.Track.