CEVA Logistics has opened a 107,639 sq ft temperature-controlled warehouse at DP London Gateway.The site, known as the ‘Chill Hub’, has 10,000 pallet positions and seven independent chambers capable of operating at -25°C to +16°C.
There will be dedicated areas for pharmaceuticals, fresh and frozen produce, beverage products and flowers, as well as other temperature-specific products.
Nicolas Sartini, chief executive at CEVA Logistics, said: “This state-of-the-art facility will enable us to offer a unique value proposition to our shipper customers, providing a faster delivery of goods through an energy-efficient building. We can also give full visibility and control of the entire inbound operation through the Chill Hub.”
By Michelle Mooney